POTW #1

(Publicly Owned Treatment of Wastewater)

The Erving POTW#1 is located 1500 feet up the Millers River from the Connecticut River. We serve the westerly section of the Town of Erving and and the Village of Millers Falls, located in the Town of Montague.

Facility Information:

  • The plant was dedicated on September 7, 1975.
  • Type: Secondary Activated Sludge
  • Design Flow: 1.02 MGD
  • Average Daily Flow: .130 MGD
  • Facility Grade: 5